Tees Renewable Energy Plant

We have been awarded a contract by Tecnicas Reunidas SA and Samsung C&T EC UK to design and supply a circulating fluidized-bed (CFB) steam generator for the Tees Renewable Energy Plant, in Teesside, UK for MGT Teesside Limited. MGT Teesside Limited has also awarded a long term service agreement contract to us for boiler maintenance. Through this agreement, for a minimum term of five years, the owner will get Sumitomo SHI FW’s operations and maintenance experience and latest technology knowhow.

  • World’s largest CFB boiler using only biomass as fuel
  • State-of-the-art renewable power plant 299 MWe CFB boiler for Tees Renewable Energy Plant, UK

Project Summary

Location: Teesside, UK

Customer: MGT Teesside Limited

Commercial operation: 2020

Plant Electrical Output: 299 MWe

Plant Heat Output: 645 MWth

Steam Flow (SH/RH): 229/205 kg/s — 1817/1629 kpph

Steam Pressure (SH/RH): 176/44 bar(a) — 2546/626 psig

Steam Temperature (SH/RH): 568/568°C — 1055/1055 °F

Feedwater Temperature: 263°C — 505°F

Fuels: Wood pellets, wood chips