We have been awarded a contract by Tecnicas Reunidas SA and Samsung C&T EC UK to design and supply a circulating fluidized-bed (CFB) steam generator for the Tees Renewable Energy Plant, in Teesside, UK for MGT Teesside Limited. MGT Teesside Limited has also awarded a long term service agreement contract to us for boiler maintenance. Through this agreement, for a minimum term of five years, the owner will get Sumitomo SHI FW’s operations and maintenance experience and latest technology knowhow.
- World’s largest CFB boiler using only biomass as fuel
- State-of-the-art renewable power plant 299 MWe CFB boiler for Tees Renewable Energy Plant, UK
Project Summary
Location: Teesside, UK
Customer: MGT Teesside Limited
Commercial operation: 2020
Plant Electrical Output: 299 MWe
Plant Heat Output: 645 MWth
Steam Flow (SH/RH): 229/205 kg/s — 1817/1629 kpph
Steam Pressure (SH/RH): 176/44 bar(a) — 2546/626 psig
Steam Temperature (SH/RH): 568/568°C — 1055/1055 °F
Feedwater Temperature: 263°C — 505°F
Fuels: Wood pellets, wood chips